Client: Maxwell Kates Incorporated
Project Location: 77th Street, New York
Project Notes: Engineering Services have been performed on numerous infrastructure upgrade projects at this Upper Eastside condominium building.
A new backflow prevention device was designed for the incoming potable water system in the building. This device was filed by our office with the Department of Environmental Protections Bureau of Cross Connection Control.
The sprinkler system was expanded to improve life safety in the common Laundry room including new sprinkler heads and pipe distribution.
A natural gas conversion and upgrade project was conducted to utilize the less expensive fuel to provide heat and domestic hot water to the building in response to New York City’s updated fuel regulations. This project included the design of a new incoming utility company gas service with gas boosters to increase the pressure for use in the boiler.