Client: Rentar Development Corp.
Project Location: Middle Village, New York
Project Notes: Engineering Services have been performed on numerous projects at this million square foot multi-use building. Base building steam fired absorption chillers and boilers were replaced with more energy efficient gas fired units. This significantly reduced the operating costs for the building. HVAC and Plumbing upgrades were designed for a 45,000 square foot municipal tenant. A new metal chimney liner was designed when the original masonry unit failed. Each of these projects was performed within budget, on-time and each project achieved or exceeded the clients anticipated goals.